Assesment of Marked Based Climate Change Policy Options for Turkey

Assesment of Marked Based Climate Change Policy Options for Turkey

Within the scope of the project, carbon tax and suitability of market based instruments for Turkey will be evaluated and the report including these assestments will be prepared. Project Owner: Ministry of Environment and Urbanisation and the World Bank through Ricardo EAE (Partnership for Market Readiness – PMR) Project Starting Date: June 2015 Project Ending Date: In Progress Project...

Read more
Determination of Sectoral Marginal Abatement Cost Curves For Turkey

Determination of Sectoral Marginal Abatement Cost Curves For Turkey

Within the scope of the project, sector-specific marginal abatement cost curves will be modeled and a report including this modeling work will be prepared. Project Owner: With Ecofys, Ministry of Environment and Urbanisation and the World Bank (Partnership for Market Readiness PMR) Project Starting Date: March 2017 Project Ending Date: In Progress Project Explanation: Turkey is

Read more
SYSC Cement Monitoring Plan and Verification of Emission Reports

SYSC Cement Monitoring Plan and Verification of Emission Reports

Within the scope of this project, services of monitoring plan for the SYSC cement facility and preparation of emission reports, were given. Project Owner: SYSC Cement Construction Industry and Trade Corp. Project Starting Date: March 2017 Project Ending Date: In Progress Project  Explanation: Enterprises that are carrying out specified activities have been obligated with monitoring, reporting...

Read more
First Tracking Plan and Service of Emission Reports Verification for AGE Denizli Natural Gas Electricity Generation Corp.

First Tracking Plan and Service of Emission Reports Verification for AGE Denizli Natural Gas Electricity Generation Corp.

Within the scope of this project, monitoring plan for the AGE Power Station and emission reports preparation services were given. Project Owner: AGE Denizli Natural Gas Electricity Production Corp. Project Starting Date: February 2016 Project Ending Date: In Progress Project Explanation: Enterprises that are carrying out specified activities have been obligated with monitoring, reporting and...

Read more
Life Enerji Neutralised Carbon Footprint Again

Life Enerji Neutralised Carbon Footprint Again

Life Enerji has actualised the carbon footprint calculation as a unit of carbon dioxide to specify the amount of greenhouse gas emissions. Life Enerji, having calculated the amount of greenhouse gas emissions from its corporate activities, did the carbon footprint calculation according to the GHG Protocol calculation methods and calculated the emission value as 40

Read more
Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey – 2nd Evaluation Meeting

Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey – 2nd Evaluation Meeting

The 2nd evaluation meeting was held on 14-15 September 2017, with the participation of private and public stakeholders, at the Ataköş Hotel in Ankara. In the scope of the Partnership for Market Readiness (PMR); “Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey” the project will model

Read more
Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey – 1st Evaluation Meeting

Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey – 1st Evaluation Meeting

The 1st evaluation meeting was held on 5 July 2017, with the participation of private and public stakeholders, at the Holiday Inn Hotel in Ankara.   In the scope of the Partnership for Market Readiness (PMR); “Determination of Economic, Fiscal and Sectoral Factors of Carbon Pricing and Sectoral Marginal Abatement Cost Curves for Turkey” project

Read more
Kartaldağı Wind Power Plant Project

Kartaldağı Wind Power Plant Project

  The report and documents below with the Gold Standard rules are prepared as a result of Local Stakeholder Meeting for Kartaldağı WPP and presented here for Stakeholder Feedback Round. We would like to invite you to forward your comments and questions related with the project during 2 months period starting from the date of 2017.06.13.

Read more
7th International Renewable Energy Conference Was Held (IRENEC 2017)

7th International Renewable Energy Conference Was Held (IRENEC 2017)

The first outcomes of the “Evaluation of Renewable Energy Technologies within Economic, Social and Environmental Indicators” Project which was benefitted by the Ministry of Energy and Natural Resources of the Republic of Turkey and carried out by the German International Cooperation Agency (GIZ) in the scope of “Promotion of Grid-Connected Renewable Energy in Turkey”, were

Read more
Closing Conference on Market-Based Emission Reduction Policy Options Assessment Project Was Held in Turkey

Closing Conference on Market-Based Emission Reduction Policy Options Assessment Project Was Held in Turkey

In the scope of the Partnership for Market Readiness (PMR); ” Evaluation of Market-Based Abatement Policy Options for Turkey” Project, evaluates the suitability of different market-based instruments to reach Turkey’s greenhouse gas emission reduction targets. International experience and the extensive participation of stakeholders in Turkey have been utilized to develop...

Read more
Verification Time Extended

Verification Time Extended

Regulation on the Amendment in Regulation on the Monitoring of Greenhouse Gas Emissions has been published in the official gazette dated 31/05/2017 and numbered 30082. Contract and Verification Time to be Signed with a Verification Organization The biggest change with the Published Regulation, that is the Regulation on Amendment, has been the extension of the

Read more
LOAD MORELoading ...