Mut Wind Power Plant Project

The report and documents below are prepared as a result of Local Stakeholder Meeting for Mut Wind Energy Farm Project and presented here for Stakeholder Feedback Round. We would like to invite you to forward your comments and questions related with the project during 2 months period starting from the date of 31.10.2014.

PROJECT INTRODUCTION FILE

download the file

MUT PROJECT DESIGN DOCUMENT

download

GOLD STANDART PASSPORT

download

Add Comment

Your email address will not be published. Required fields are marked *