Koru Wind Power Plant Project

The report and documents below are prepared as a result of Local Stakeholder Meeting for Koru WPP and presented here for Stakeholder Feedback Round. We would like to invite you to forward your comments and questions related with the project during 2 months period starting from the date of 31.10.2014 .

GOLD STANDARD PASSPORT OF KORU WPP

Download | DropBox

KORU WPP PROJECT SUMMARY

Türkçe | English

PROJECT DESIGN DOCUMENT (DSS) OF KORU WPP

Download (English)

LOCAL STAKEHOLDER CONSULTATION REPORT OF KORU WPP

Download (English)

Add Comment

Your email address will not be published. Required fields are marked *