Harmanlık Wind Power Plant Project

The report and documents below are prepared as a result of Local Stakeholder Meeting for Harmanlık WPP and presented here for Stakeholder Feedback Round. We would like to invite you to forward your comments and questions related with the project during 2 months period starting from the date of 31.10.2014.

GOLD STANDARD PASSPORT OF HARMANLIK WPP

Download (English)

HARMANLIK WPP PROJECT SUMMARY

Download (English)

PROJECT DESIGN DOCUMENT (PDD) OF HARMANLIK WPP

Download (English)

LOCAL STAKEHOLDER CONSULTATION REPORT OF HARMANLIK WPP

Download (English)